MEGAROLLER

Objective

 

The project aims to design, build and validate a generic high performance, cost-efficient and reliable PTO that can be integrated into oscillating wave surge converter (OWSC) designs and therefore massively deployed by the global energy sector.

 

 

WavEC Results

 

  • Coordination of the environmental and socioeconomic aspects of the project

 

  • Application of a Life Cycle Assessment (LCA) to support decision making through a comparative analysis between different designs

 

  • Development of a EIA decision making tool aiming the user decide on best monitoring techniques across all development phases through a stressor-receptor interaction approach.

 

General Information

Funding: Horizon2020
Project Coordinator at WavEC: Pedro Vinagre
Total Funding (Requested EU contribution): € 4 946 770
WavEC Funding: € 150 000
Duration: May 2018 – November 2021 (43 months)
Coordinator: AW-Energy
Partners: ABB Finland, Cruz Atcheson, Hydroll, Hydman, SINTEF, VTT, University of Bergen, Leibniz Institute for Neurobiology and WavEC Offshore Renewables.

Website: https://www.sintef.no/MegaRoller