WAVETRAIN
Wavetrain1 was funded by the 6FP of the EC. Wavetrain2 project was a multinational Initial Training Network (ITN) funded under the FP7-People program, in order to face the wide range of challenges that industrial-scale wave energy implementation faces in the near future, focusing on technical issues, from hydrodynamic and PTO (Power Take-Off) design, to instrumentation issues and energy storage and cost reduction show to be critical for successful deployment.
On the other hand, also non-technical “barriers”, typically less tangible difficulties related to legal issues (licensing, conflicts of use, EIA procedures, grid connection, regional differences) and the non-sufficient representation of socio-economic benefits of the sector, were dealt with, as they are seen as a major obstacle for fast implementation on a European scale.